RAILWAY LAYING
CRANES
14
UNITS
UK 25-18, UK 25-9, KZhU-571, UK-25/25
(disassembly and laying of rail-sleeper grate)
UNITS
UK 25-18, UK 25-9, KZhU-571, UK-25/25
(disassembly and laying of rail-sleeper grate)
UNITS
MPD, MPD-2, MPK
(tensioning of rail-sleeper grate packages)
UNITS
ELB-4
(track lifting during ballasting)
UNITS
Models 55-76 and 55-76M
(transportation of crushed stone and ballasting of the track)
UNITS
Unified Removable Hardware
(Transportation of Rail Sleeper Grate)
UNITS
PBR-01, USP 2005SW
(planning and redistribution of freshly filled ballast)
UNITS
VPO-3000
(straightening, fitting and finishing of the track, ballast compaction)
UNITS
VPRS-03
(straightening of the path in longitudinal and transverse profiles and in plan view)
UNITS
Duomatic 08-32U
(straightening of the path in longitudinal and transverse profiles and in plan view)
UNITS
DGKU, MPT
(transportation of workers, small mechanization equipment and tools)
UNITS
GR-215, D3-98, SEM-19
(grading and profiling of areas and slopes, leveling and movement of soil)
UNITS
DET-250, SHANTUI
(movement and development of soil or other rocks)
UNITS
CMV MODEL
(transportation of personnel and command personnel)
UNIT
PRV-250
(restoration of the working profile of the head of old-fashioned rails)
UNIT
K-100
(contact connection of rail welding in stationary conditions)
UNITS
ZL-50
(movement of soil and building materials)
UNITS
XCMG-QY25K
(lifting and moving construction materials)
UNITS
BASED ON KAMAZ VEHICLE
(transportation of shift crews, movement of construction materials)
UNIT
BOMAG MPH600
(processing of worn asphalt, patching of asphalt pavement)
UNIT
BASED ON KAMAZ VEHICLE
(uniform application of binding materials on the road surface)
UNITS
BASED ON KAMAZ VEHICLE
(short-term storage and transportation of bitumen to the road works site)
UNITS
«SADKO NEXT» GAZELLE CAR
(cargo and passenger transportation, loading by crane-manipulator)
UNITS
BOMAG BF800C
(manufacture of asphalt concrete and bitumen mineral mixtures)
UNITS
BOMAG BW161 AD-50
(layer-by-layer compaction of road bases)
UNITS
BOMAG BW161 AD-50
(layer-by-layer compaction of road bases)
UNITS
BOMAG BW151 AC-50
(layer-by-layer compaction of road bases)
UNITS
CAPACITY 160 TONS/HOUR
(manufacture of asphalt concrete and bitumen mineral mixtures)
UNITS
ON THE BASIS OF 20-40' CONTAINERS
(examination of building materials and examination of the roadway)