Railway line «Uzen-State border with Turkmenistan»
«Beineu-Shalkar» railway line
«Borzhakty-Ersay» railway line
«Shu-Anyrakai» railway line
Aktau Seaport
Modernization of Birshogyr crushed stone plant
Restoration and renovation using ESAB technology
Railway Comlex for «Shubarkol Premium» JSC
Highway «Beineu-Akzhigit»
Highway «Kaztalovka-Zhanibek»
Highway «Karaganda-Balkhash»
Electrification of the «Pap-Namangan-Andijan» railway
Railway «Bender-Bessarabka-Etulia-Dzhurdzhulesti»
«Pap-Namangan-Andijan» Railway, SCI and Communications
MPC and communications at «Bogatyr» coal mine
«Dostyk-Moyynty» Railway
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2010-2011
CONSTRUCTION OF A NEW RAILWAY LINE «UZEN-STATE BORDER WITH TURKMENISTAN»
In order to organize export and transit rail transportation with the countries of the Persian Gulf region, «Temirzhol Zhondeu» LLP built a railway track on the Uzen-State Border with Turkmenistan section. On May 11, 2011, in the presence of President of the Republic of Kazakhstan Nursultan Nazarbayev and President of Turkmenistan Gurbanguly Berdimuhamedov, a solemn docking of the "golden" canvas and the official opening of the «Bolashak-Serkhetyak» international railway crossing took place.
PROJECT PASSPORT
Customer
JSC NK KTZh
General contractor
«Temirzhol Zhondeu» LLP
The length of the line
201 km
Infrastructure
7 separate points, 11 crossings, protective hedges
Line Running Areas
Mangystau region
Construction method
Dual-beam
2012-2018
CONSTRUCTION OF NEW «ZHEZKAZGAN-BEINEU» RAILWAY LINE (BEINEU-SHALKAR SECTION)
«Temirzhol Zhondeu» LLP was the General Contractor for the construction of the new Zhezkazgan-Beineu railway line: construction of the «Shalkar-Beineu» section.
PROJECT PASSPORT
Customer
JSC NK KTZh
General contractor
«Temirzhol Zhondeu» LLP
The length of the line
494.3 km of main tracks, 66.7 km of station tracks
Infrastructure
20 separate points and stations, dispatching centralization, EC, optical-fiber communication, power supply, radio communication, overpass
Line Running Areas
Aktobe and Mangistau regions
Construction method
Dual-beam
2014-2016
CONSTRUCTION OF NEW RAILWAY LINE «BORJAKTY-ERSAY»
«Temirzhol Zhondeu» LLP was the General Contractor for the construction of the new «Borjakty-Yersai» railway line.
PROJECT PASSPORT
Customer
JSC NK KTZh
General contractor
«Temirzhol Zhondeu» LLP
The length of the line
22,2 km
Infrastructure
2 separate points, 2 culverts, 1 overpass, production buildings, 10 kV power lines, fiber optic communication lines
Line Running Areas
Mangystau Region
2015-2018
CONSTRUCTION OF SECOND TRACKS AT «SHU-ANRAHAY» SITE
As part of the implementation of the new economic policy of the Republic of Kazakhstan «Nurly Zhol - Path to the Future», the construction of second tracks was carried out to ensure an increase in train speed and capacity at the «Almaty-Shu» railway section.
The project «Expansion of the Aktau International Commercial Seaport in the Northern Direction» was implemented within the framework of the new economic policy of the Republic of Kazakhstan «Nurly Zhol - Way to the Future».
PROJECT PASSPORT
Customer
«Koncern Nayza-Kurylys» LLP
General contractor
«Temirzhol Zhondeu» LLP
The length of the line
3.82 km of station tracks, 17 sets of switches
Infrastructure
Reconstruction of SCI and communication
Line Running Areas
Aktau Seaport, northbound
2015-2016
MODERNIZATION OF BIRSHOGYR CRUSHED STONE PLANT
Modernization of the plant with the acquisition of a new crushing and sorting complex (DSK-300) and modernization of the existing one (DSK-350).
PROJECT PASSPORT
Customer
«Temirzhol Zhondeu» LLP
Equipment manufacturer
SANDVIK (Sweden)
Pre-Upgrade Performance
1,104 thousand tons per year
Post-Upgrade Performance
2 186 thousand tons per year ДСК-350 - 1 155 thousand tons per year; ДСК-300 - 1 031 thousand tons per year
Location
Aktobe region, Shalkar district, Birshogyr station, Sarysay village
2016
RESTORATION AND RENOVATION OF METAL PRODUCTS USING THE TECHNOLOGY OF THE SWEDISH COMPANY «ESAB»
Restoration and renovation of metal products using «ESAB» technology
PROJECT PASSPORT
Customer
«Temirzhol Zhondeu» LLP
Joint venture
«Kamkor Technology» LLP
Primary activity
The project with the participants of «Temirzhol Zhondeu» LLP and «ISS TECH» LLP (official dealer of «Kazakhstan Welding House» LLP) was aimed at satisfying the needs of production enterprises in the materials of the track topsides, parts of railway equipment, mining specialized equipment and equipment for factories.
Location
Zhambyl region, Shu city
2016-2018
CONSTRUCTION OF THE RAILWAY COMPLEX TO THE COAL SECTION «TSENTRALNY-2»
Construction of a railway complex at the «Shubarkol Coal Mine» thermal coal deposit of «Shubarkol Premium» JSC
PROJECT PASSPORT
Customer
«Shubarkol Premium» JSC
General contractor
«Temirzhol Zhondeu» LLP
The length of the line
6,210 km
Infrastructure
Artificial structures, VL-10kV reconstruction, retaining wall, power supply and lighting, railway crossing
Line Running Areas
Karaganda region
2017-2020
RECONSTRUCTION OF THE NATIONAL HIGHWAY «BEINEU-AKZHIGIT-BORDER OF THE REPUBLIC OF UZBEKISTAN» (TO NUKUS)
As part of the implementation of the new economic policy of the Republic of Kazakhstan «Nurly Zhol - Way to the Future» «Temirzhol Zhondeu» LLP has mastered the market for the construction and repair of highways.
PROJECT PASSPORT
Customer
JSC NC «KazAvtoZhol»
General contractor
«Temirzhol Zhondeu» LLP
The length of the road
85 km
Road running areas
Mangystau region
2019-2021
OVERHAUL OF THE SECTION OF THE «KAZTALOVKA-ZHANIBEK-BORDER HIGHWAY OF THE RUSSIAN FEDERATION»
«Temirzhol Zhondeu» LLP has carried out a set of works to fully restore and improve the operability of the road pavement and pavement, roadbed and road structures.
PROJECT PASSPORT
Customer
JSC NC «KazAvtoZhol»
General contractor
«Temirzhol Zhondeu» LLP
The length of the road
85 km (category 3), km 53-95 and km 95-138
Infrastructure
1 bridge, 35 culverts, 1 rest area, heating areas
Road running areas
West Kazakhstan region
2019-2021
RECONSTRUCTION OF THE CENTER-SOUTH CORRIDOR «ASTANA-KARAGANDA-BALKHASH-ALMATY» OF THE HIGHWAY «BORDER OF THE RUSSIAN FEDERATION (TO YEKATERINBURG) - ALMATY» (AKSHATAU-AKZHAL SECTION)
«Temirzhol Zhondeu» LLP is implementing a project in accordance with the program of the Government of the Republic of Kazakhstan to update the country's republican roads managed by the Highway Committee of the Ministry of Investment and Development. The program aims to improve the transportation and transit of goods in the country and around the country, as well as in neighboring countries.
PROJECT PASSPORT
Customer
JSC NC «KazAvtoZhol»
General contractor
CITIC Construction Co., LTD
Contractor
«Temirzhol Zhondeu» LLP
The length of the road
20 km, km 1740-1760
Infrastructure
18 small man-made structures, 3 bridge crossings, 2 stopping areas and 2 rest areas
Road running areas
Karaganda region
2019-2021
ELECTRIFICATION OF THE RAILWAY LINE «PAP-NAMANGAN-ANDIJAN» WITHIN CAREC, TRANSPORT CORRIDOR 2
As part of the State Program for Electrification of Railways of the Republic of Uzbekistan «Temirzhol Zhondeu» LLP entered the international market for the provision of services and took part in the construction of SCB and communication on the section of the «Pap-Namangan-Andijan» railway line, which connects the eastern part of Uzbekistan with Kyrgyzstan. 13.12.2021 of the year the Completion Certificate was received.
PROJECT PASSPORT
Customer
«Uzbekistan Temir Yullari» JSC
General contractor
«Temirzhol Zhondeu» LLP
Work types
Design, construction, supply, installation and commissioning of SCI and communication systems.
Road running areas
Namangan, Andijan and Ferghana regions of the Republic of Uzbekistan
2022-2025
DESIGN AND RECONSTRUCTION OF RAILWAY INFRASTRUCTURE FACILITIES ON THE «BENDER-BESSARABKA-ETULIA-DZHURDZHULESTI» LINE
In 21.12.2021, in the city of Chisinau (Republic of Moldova), a contract was signed for the «Design and Reconstruction of Railway Infrastructure Facilities on the Bender-Bessarabka-Etulia-Giurgiulesti» Line. «Temirzhol Zhondeu» LLP was recognized as the winner following the results of two stages of the tender. The source of financing for this project is the European Development Bank. The implementation of the project will bring the infrastructure and system of railway tracks in line with acceptable standards, improve train speeds, passenger comfort and ensure a long service life.
PROJECT PASSPORT
Customer
State Enterprise «Railways of Moldova»
General contractor
«Temirzhol Zhondeu» LLP
Infrastructure
Design and Renovation of Track Topsides, Signaling, Telecommunication and Power Supply Systems
Length of line
270 km
2022-2025
ELECTRIFICATION OF THE RAILWAY SECTION «PAP-NAMANGAN (KOKAND) -ANDIJAN». SCI AND COMMUNICATION (REPUBLIC OF UZBEKISTAN)
According to the approved development plan for 2021-2025, the implementation of volumes in the segment of construction, reconstruction, development of railway lines is planned to participate in the project «Electrification of the Pap-Kokand-Andijan railway section» (Republic of Uzbekistan), SCI and communications.
PROJECT PASSPORT
Customer
«Uzbekistan Temir Yullari» JSC
General contractor
«Temirzhol Zhondeu» LLP
Infrastructure
Design, construction, supply, installation and commissioning of SCI and communication systems.
Length of line
330 km
Road running areas
Namangan, Andijan and Ferghana regions of the Republic of Uzbekistan
2022-2023
IMPLEMENTATION OF THE MICROPROCESSOR CENTRALIZATION (MPC) AND RAILWAY COMMUNICATION SYSTEM AT THE «BOGATYR» COAL MINE
The project provides for the implementation of a microprocessor centralization system (MPC) and communication of connecting and loading railway tracks of the facilities of the surface complex of autoconversion technology with averaging of coal at the «Bogatyr» section.
PROJECT PASSPORT
Customer
«Bogatyr Komir» LLP
General contractor
«Temirzhol Zhondeu» LLP «Kamkor Service» LLP
The length of the line
23 km
Infrastructure
Construction and installation works of the post and floor equipment, adjustment and adjustment of the devices of the internal and floor equipment of the MPC, MS RC based on the shopping and entertainment center, MTR, laying and connection of the fiber optic cable and power supply devices, checking the dependencies of arrows and signals, installation of transportable modules
Line Running Areas
Pavlodar region, Ekibastuz city
2022-2025
CONSTRUCTION OF SECOND TRACKS OF «DOSTYK-MOYYNTY» RAILWAY SECTION BETWEEN SAYAK-AKTOGAY STATIONS
The project for the construction of second tracks on the «Dostyk-Moyynty» section is being implemented as part of the fulfillment of the tasks set by the Head of State to ensure uninterrupted export of domestic products and increase the country's transit potential. The implementation of the largest infrastructure project will increase the capacity of the railway infrastructure of the site fivefold (from 12 to 60 pairs of freight trains per day).